Electrical kit on a market stall or in a catering trailer has a harder life than the same equipment sitting on a counter in a shop. Leads get coiled tight and thrown in a van at the end of the day, plugs get dragged across wet tarmac, and the whole lot gets plugged into a supply the trader has never seen before. Then it happens again the following weekend somewhere else. That pattern of use, rather than anything specific to catering, is why traders tend to fail on cables and connectors more than on the appliances themselves.
Traders working Chesterfield's open-air market, the Bakewell and Matlock market days, Buxton events, Sheffield street food pitches and the county shows are usually running one or two vehicles and a handful of leads. The paperwork question comes up because an organiser asks for it, often a few days before the pitch.
What the law asks of a trader
The Electricity at Work Regulations 1989 require electrical systems to be maintained so far as reasonably practicable to prevent danger. Regulation 4(2) is the one that matters here, and it says nothing about PAT testing by name. It asks you to maintain, and inspection and testing is the usual way of showing you have. The Health and Safety at Work etc. Act 1974 adds a duty towards people who are not your employees, which for a food trader means the queue standing a metre from your serving hatch.
Sole traders sometimes assume none of this applies to them. Since October 2015, self-employed people are outside general health and safety law only where their work cannot harm anyone else. Serving the public from a unit fed by a shared site supply does not meet that test. If you employ anyone, even casually on busy weekends, the Provision and Use of Work Equipment Regulations 1998 apply to the equipment you give them to use.
The organiser's document pack
In practice the thing that forces the issue is the booking form. Market operators, festival organisers and event managers commonly ask for public liability insurance, a food hygiene rating, a written risk assessment, an annual gas safety certificate from a Gas Safe registered engineer covering the LPG side, and evidence that the electrical equipment has been inspected and tested. Membership bodies such as NCASS build the same list into their due diligence guidance for caterers.
What organisers want to see is a dated record listing the items tested and who tested them, not a single sticker on a fryer. A register you can email as a PDF saves a lot of back and forth when three different events ask in the same fortnight.
What gets tested on a van or stall
The appliance list is usually shorter than traders expect and the lead list longer. Fryers, griddles, coffee machines, water boilers, blenders, under-counter fridges, chest freezers, card readers, phone chargers and lighting all sit on the appliance side. Then there are the 16A and 32A blue hook-up leads to BS EN 60309, extension reels, adaptors and any portable RCD you carry. Cable reels used while still coiled run hot, and a lead that has been repeatedly wound under tension often shows up as a poor earth continuity reading long before anything looks wrong from the outside.
The unit's own wiring is a separate piece of work
PAT testing covers what you plug in. The fixed wiring inside a catering trailer or converted van is an electrical installation in its own right, and Section 717 of BS 7671 sets out the requirements for mobile or transportable units, including how the unit takes its earth and the notice recording when it was last inspected and tested. A unit supplied from a PME site supply has restrictions on using that earth, which is why many trailers are built with their own earth electrode arrangement or run from a generator with a specific earthing arrangement. That side needs an electrician carrying out a periodic inspection of the installation. We cover the difference between the two in more detail in our guide to what a PAT test actually involves.
How often
The IET Code of Practice for In-service Inspection and Testing of Electrical Equipment, now in its 5th edition, sets intervals by risk rather than by trade. Equipment that is transported, used outdoors, exposed to water and handled by the public sits at the short end of that scale. Twelve months is what most organisers look for on a certificate, with leads and anything that has taken a knock checked more often than that, and a quick visual check by the trader before each trading day.
We test at your yard, unit or home address across Chesterfield and north Derbyshire and into South Yorkshire, usually with the van parked up and everything plugged in where it normally lives. A single catering unit is typically an up to an hour visit from £50, and operators with several trailers or a stall plus a van are better served by a half day from £125. Traders who also pitch at events around York can book through our York branch instead. Most people book in the quieter weeks before the market and festival season starts, which is also when a failed lead is cheapest to deal with.
Frequently Asked Questions
Do market traders legally need PAT testing?
No UK law names PAT testing as a requirement for market traders. The Electricity at Work Regulations 1989 do require electrical equipment to be maintained so that it does not cause danger, and inspection and testing is the normal way of demonstrating that. In practice most market operators and event organisers make a current test record a condition of booking a pitch, so traders end up needing it either way.
Does a mobile catering trailer need an EICR as well as PAT testing?
Yes, they cover different things. PAT testing covers the appliances and leads you plug in, while the trailer's own fixed wiring is an electrical installation governed by Section 717 of BS 7671, which deals with mobile or transportable units and how they take their earth from a site supply or generator. A periodic inspection of that installation is carried out by an electrician and results in a report, commonly renewed annually for units in regular use.
How often should equipment in a catering van be PAT tested?
The IET Code of Practice sets intervals based on risk rather than by trade, and equipment that is transported, used outdoors and exposed to water sits at the frequent end of that scale. Twelve months is the interval most event organisers expect to see on a certificate. Hook-up leads, extension reels and anything that has been damaged or dropped are worth checking more often, along with a visual check by the trader before each trading day.
Are 16A hook-up leads and extension reels included in a PAT test?
Yes, and they are among the most common failures on mobile catering units. Leads that are repeatedly coiled under tension, dragged across ground or pulled from the plug often show poor earth continuity or damaged cores well before anything looks wrong from outside. Testing includes a polarity check on longer leads, which picks up incorrectly wired blue commando connectors.
What electrical paperwork do event and market organisers usually ask street food traders for?
Typical requests are public liability insurance, a food hygiene rating, a written risk assessment, an annual LPG gas safety certificate from a Gas Safe registered engineer, and a dated record of electrical inspection and testing. The electrical record should list the individual items tested and who tested them rather than being a single sticker on one appliance. Keeping it as a PDF you can email saves repeating the exercise every time a new organiser asks.
